Go Back

Small Diamonds Knitting Stitch Pattern

Learn how to knit the Small Diamonds Knit Stitch
Prep Time15 minutes
Active Time1 hour 30 minutes
Total Time1 hour 45 minutes

Equipment

  • Knitting Needles (Recommended Size for Yarn)
  • Darning Needle
  • Scissors

Materials

  • Any Yarn

Instructions

  • CO 14 STS
  • Row 1: K3 *CR, K4* CR, K3
  • Row 2-12 (even rows only): *P*
  • Row 3: *K2, CR, CL* K2
  • Row 5: K1 *CR, K2, CL* K1
  • Row 7: *CR, K4* CR
  • Row 9: K1 *CL, K2, CR* K1
  • Row 11: *K2, CL, CR* K2
  • Repeat rows 1-12 until desired length.

Abbreviations

  • *– * – repeat between the asterisks
  • CO – cast-on (long-tail cast-on method)
  • CL – Knit into the back of the second stitch, and then the back of the first stitch and then slip both off.
  • CR – Knit into the front of the second stitch, and then the front of the first stitch and then slip both stitches off.
  • K – knit stitches (example: K1 means to knit 1 stitch)
  • P – purl stitches (example: P2 means to purl 2 stitches)
  • STS - stitches